Florida house under construction with electrical rough-in in the framing
Residential New Construction

New Home Wiring Done Right

From temporary power to final trim-out, Coastline Electric handles every phase of residential new construction electrical in Hillsborough, Pasco, Hernando, Polk, Pinellas, and Citrus counties. Licensed since 1984, we pull the permits, pass the inspections, and keep your build on schedule.

Complete Electrical Wiring for New Residential Construction

Building a new home is one of the largest investments you'll ever make. The electrical system is the backbone of everything that makes a modern home comfortable, safe, and functional, and getting it right from the start is far less expensive than fixing mistakes after the drywall goes up. Coastline Electric Inc. has been wiring new homes across Hillsborough, Pasco, Hernando, Polk, Pinellas, and Citrus counties since 1984, working alongside builders, general contractors, and owner-builders to deliver code-compliant, inspection-ready electrical systems on schedule.

Our process covers every phase of construction: temporary power for the job site, underground service entrance, rough-in wiring, panel installation, low-voltage pre-wiring for smart home and security systems, and final trim-out with all devices, fixtures, and cover plates. We pull every permit, coordinate with the utility company, and attend every inspection, so your builder never has to chase down the electrician.

Every Phase, Handled

Temporary Power & Job Site Service

We install the temporary power pole and meter base so your crew can power tools from day one. We coordinate the utility connection with TECO, Duke Energy, or Withlacoochee River Electric.

Underground Service Entrance

Trenching and installation of the underground service entrance conduit and conductors from the utility transformer to your main panel location, sized correctly for your home's load requirements.

Rough-In Wiring

All branch circuit wiring run before drywall, outlets, switches, lighting, kitchen and bath circuits, HVAC disconnect, dryer, range, and any dedicated circuits for appliances, hot tubs, or pools.

Panel Installation & Service Upgrade

Main panel installation with properly sized breakers, AFCI and GFCI protection where required by Florida code, and a clean, labeled directory. Most new homes are wired for 200-amp service; larger homes may require 400-amp.

Low-Voltage & Smart Home Pre-Wire

CAT6 data drops, coaxial cable, whole-home audio wiring, security camera conduit, and smart lighting control wiring. all run during rough-in when it's fast and inexpensive.

Final Trim-Out & Inspection

Installation of all devices (outlets, switches, dimmers), light fixtures, exhaust fans, panel cover, and final labeling. We schedule and attend the county final inspection and provide sign-off documentation.

Florida Code Requirements for New Construction

Florida follows the National Electrical Code (NEC) with state-specific amendments enforced by each county's building department. New residential construction in our service area must meet the following requirements, among others:

  • AFCI (Arc Fault Circuit Interrupter) protection on all bedroom, living room, dining room, hallway, and closet circuits
  • GFCI (Ground Fault Circuit Interrupter) protection in kitchens, bathrooms, garages, outdoors, and within 6 feet of any water source
  • Tamper-resistant outlets throughout the home
  • Smoke detectors hardwired with battery backup in every bedroom, outside each sleeping area, and on every floor
  • Carbon monoxide detectors hardwired in homes with attached garages or gas appliances
  • Dedicated 20-amp circuits for kitchen countertop outlets and bathroom outlets
  • Whole-home surge protection strongly recommended (required by some counties)

Coastline Electric stays current with all NEC and Florida code updates. We design your rough-in to pass inspection the first time, avoiding costly re-inspections that delay your certificate of occupancy.

Future-Proof Your New Home

New construction is the best opportunity to build in infrastructure that would be expensive to add later. We recommend every new home owner consider the following during rough-in:

EV Charger Circuit

A dedicated 50-amp, 240V circuit to the garage costs very little to add during rough-in. Installing it later requires opening walls and running wire through finished spaces.

Generator Transfer Switch

Pre-wiring for a whole-home standby generator or installing a manual transfer switch during construction is far less expensive than retrofitting after the home is complete.

Whole-Home Surge Protector Installation

A main-panel surge protector installed during construction protects all electronics, HVAC equipment, and appliances from Florida's frequent lightning strikes and utility surges.

Structured Wiring Panel

A centralized low-voltage panel for CAT6, coaxial, and speaker wiring gives you a clean, organized hub for your home network, TV, and audio systems.

Outdoor Living Circuits

Dedicated circuits for the lanai, pool equipment, outdoor kitchen, and landscape lighting are easiest to run during construction before the slab and landscaping are complete.

Subpanel for Detached Garage or Workshop

If you plan a detached garage, workshop, or ADU, running the underground feeder during construction avoids expensive trenching through finished landscaping later.

Working with Builders & Contractors

Coastline Electric has been a trusted electrical subcontractor for custom home builders, production builders, and owner-builders across Hillsborough, Pasco, Hernando, Polk, Pinellas, and Citrus counties for over 40 years. We understand that your schedule is your business, and we treat every project deadline as our own.

We provide detailed rough-in schedules coordinated around framing, HVAC, and insulation milestones. Our crew shows up when they're supposed to, communicates proactively about any issues, and leaves the job site clean. We handle all permit applications, inspection scheduling, and utility coordination so your project manager isn't chasing paperwork.

If you're a builder looking for a reliable electrical sub in Pasco, Hillsborough, Hernando, or Polk County, call us at (727) 862-7950 or email office@coastlineelectric.us to discuss your upcoming projects.

Why Choose Coastline Electric

  • 40+ years in Florida, established 1984
  • Licensed Florida Electrical Contractor. License #EC0002969
  • We handle permits, utility coordination, and inspection
  • Insurance documentation included after every job
  • AVETTA certified, trusted by major corporations

Frequently Asked Questions

We handle every phase: temporary power for the job site, underground service entrance, rough-in wiring (before drywall), panel installation, low-voltage pre-wire (data, audio, security), and final trim-out with all devices, fixtures, and cover plates. We also coordinate the utility connection and county inspection.
Yes. Coastline Electric pulls all required electrical permits with the county, coordinates the rough-in inspection before drywall, and schedules the final inspection after trim-out. We handle all paperwork so your builder can focus on the rest of the project.
Absolutely. We regularly work as the electrical subcontractor for custom home builders, production builders, and owner-builders throughout our service area. We coordinate scheduling around framing, HVAC rough-in, and insulation to keep your project on track.
Most new homes in Florida are wired for 200-amp service, which supports modern appliances, EV chargers, whole-home generators, and smart home systems. Larger custom homes with multiple HVAC systems, pools, or workshops may require 400-amp service. We assess your load requirements and recommend the right service size during the planning phase.
Yes. During rough-in we can pre-wire for structured wiring panels, CAT6 data drops, whole-home audio, security cameras, smart lighting controls, and EV charger circuits. It is far less expensive to run these wires during construction than to retrofit them later.
A typical 2,000–3,000 sq ft single-family home takes 2–4 days for rough-in, depending on complexity. Custom homes with smart home pre-wiring, pools, or detached garages may take longer. We provide a detailed schedule at the start of the project so your builder can plan accordingly.
Yes. We install the temporary power pole and meter base needed to power tools and equipment during construction, and coordinate the utility connection with TECO, Duke Energy, or Withlacoochee River Electric depending on your location.
Yes, and we strongly recommend it. Installing a generator transfer switch or interlock kit during construction is significantly cheaper than retrofitting it later. We can also pre-wire for a future standby generator so the infrastructure is in place whenever you're ready.

Service Areas

Hillsborough County

Brandon, Tampa, Riverview, Valrico, Plant City, Lutz, Bloomingdale, Sun City Center

Pasco County

Wesley Chapel, New Port Richey, Land O' Lakes, Zephyrhills, Dade City, Hudson, Trinity

Hernando County

Spring Hill, Brooksville, Hernando Beach, Weeki Wachee

Polk County

Lakeland, Winter Haven, Bartow, Lake Wales, Auburndale, Davenport

Pinellas County

Clearwater, St. Petersburg, Largo, Dunedin, Safety Harbor

Citrus County

Crystal River, Inverness, Lecanto, Beverly Hills, Citrus Springs, Pine Ridge, Hernando

Building a New Home in Florida?

Licensed Florida Electrical Contractor. License #EC0002969 · Serving Florida since 1984

(727) 862-7950
Schedule a Visit