Three-phase commercial distribution panel with its cover open
Commercial & Industrial

Commercial Panel Upgrades & 3-Phase Service

Growing businesses need more power. We upgrade commercial electrical panels, install 3-phase service, and coordinate with utilities to ensure your facility has the capacity to support your operations, now and in the future.

Commercial Electrical Upgrade Services

From panel replacements to full service entrance upgrades. we handle the entire process.

Commercial Panel Replacement & Upgrades
3-Phase Service Installation
Service Entrance Upgrades (200A–2000A)
Sub-Panel Installation for Expansions
Switchgear & Transformer Installation
Load Analysis & Future Capacity Planning
Utility Coordination (TECO, Duke Energy, WREC)
Permit Coordination & Inspection Sign-Off

Signs Your Commercial Panel Needs an Upgrade

Breakers trip frequently under normal load
You can't add new circuits without overloading the panel
The panel is more than 25 years old
You're adding new equipment (HVAC, kitchen equipment, machinery)
You're expanding your facility or adding a tenant space
Your insurance company requires an upgrade for coverage
Lights flicker or dim when equipment starts
You're converting from single-phase to 3-phase service

3-Phase vs. Single-Phase: Which Does Your Business Need?

Single-Phase Service

Best for smaller commercial spaces with standard loads, offices, retail, small restaurants, and service businesses without heavy equipment.

  • Standard 120/240V service
  • Lower installation cost
  • Sufficient for most office and retail loads

3-Phase Service

Required for businesses with heavy equipment, large HVAC systems, commercial kitchens, manufacturing, or any facility with motors over 5 HP.

  • 208V or 480V 3-phase service
  • More efficient for motor-driven equipment
  • Required for most commercial kitchen equipment
  • Supports EV fleet charging infrastructure

Industries We Serve

Restaurants & Food Service
Medical & Dental Offices
Manufacturing & Industrial
Retail & Shopping Centers
Automotive & Service Shops
Warehouses & Distribution

Why Choose Coastline Electric

  • 40+ years in Florida, established 1984
  • Licensed Florida Electrical Contractor. License #EC0002969
  • We handle permits, utility coordination, and inspection
  • Insurance documentation included after every job
  • AVETTA certified, trusted by major corporations

Frequently Asked Questions

Common signs include frequently tripping breakers, inability to add new equipment or circuits, a panel that's over 25 years old, or a business expansion requiring more power. We perform a load analysis to determine your current usage versus panel capacity and recommend the right upgrade.
3-phase power delivers electricity in three alternating currents, providing more consistent power for heavy equipment. Restaurants with commercial kitchen equipment, medical offices with imaging machines, manufacturing with motors, and any business adding HVAC equipment over 5 tons typically benefit from 3-phase service.
A standard commercial panel replacement typically takes 1–2 days. A full service entrance upgrade with utility coordination can take 3–5 days including the utility reconnection. We schedule work to minimize impact on your business operations.
Yes. Service entrance upgrades require coordination with TECO, Duke Energy, or Withlacoochee River Electric Cooperative for the utility side of the connection. We manage this coordination, including scheduling the utility disconnect and reconnect, so you don't have to navigate that process yourself.
Service size depends on your total electrical load, equipment, HVAC, lighting, and future expansion plans. Most small commercial buildings need 200A single-phase or 3-phase service. Larger buildings, restaurants, and manufacturing facilities often require 400A–2000A service. We perform a load calculation to determine the right size.
Yes. Adding a sub-panel is often the most cost-effective way to add capacity for a specific area without replacing the main panel. We install sub-panels fed from the main panel to serve additions, new equipment areas, or tenant spaces.
Yes. All commercial electrical panel work in Florida requires a permit and inspection. We handle the permit application, coordinate the required inspections, and obtain final sign-off from the local building department.

Service Areas

State of Florida

We serve commercial and industrial clients statewide, from Pensacola to Miami, Tampa Bay to the Space Coast. No project is too far.

Need More Power for Your Business?

Licensed Florida Electrical Contractor. License #EC0002969 · Serving Florida since 1984

(727) 862-7950
Schedule a Visit